
- Service: Drilling Engineering
- Client: Offshore Operator
- Loaction: Deepwater GOM
Gulf of Mexico HP/HT Well Design
Challenge:
High-pressure/high-temperature (HP/HT) well with:
-
Pore pressure gradient: 0.92 psi/ft
-
Bottomhole temp: 410°F
-
History of casing collapses in the field
Solution:
-
Geomechanical modeling to optimize mud weights
-
Expandable liner design for weak zones
-
Real-time PPFG monitoring while drilling
Results:
✓ Zero well control incidents
✓ Drilled to TD 14 days ahead of schedule
✓ Saved $4.3M in contingency costs