Frequently Asked Questions

Essential FAQs

We combine 25+ years of field experience with advanced simulation tools (Petrel, Eclipse) to create recovery plans tailored to your reservoir’s specific geology. Unlike theoretical models, our methods are proven across conventional, unconventional, and offshore fields – typically delivering 15-30% higher recovery rates than standard approaches.

Our geomechanics-driven well designs optimize casing programs and mud weights while implementing real-time monitoring. Recent projects achieved:
✔ 18-22% faster drilling times
✔ Zero well control incidents in 7 years
✔ $1.4M average savings per well

Absolutely. We specialize in brownfield redevelopment using:

  • Artificial lift optimization (ESP/gas lift redesign)

  • Waterflood pattern rebalancing

  • Targeted recompletions
    Example: A Permian Basin client saw production jump from 1,200 to 2,100 BOPD within 6 months.

We serve all operator sizes – from single-well independents to IOCs. Our flexible engagement model includes:
✓ Project-based consulting
✓ Part-time staff augmentation
✓ Training programs for in-house teams

We engineer practical decarbonization through:

  • Flare gas capture systems (up to 60% emissions reduction)

  • CCUS-ready reservoir studies

  • Solar-hybrid field designs
    All while maintaining profitability – our solutions average <3-year payback periods.

Request a free Quote